TENDER NOTICE FOR CONSTRUCTION OF 140 LATRINES IN MERKA DISTRICT-LOWER SHABELLE REGION –SWS OF SOMALIA

JOB DESCRIPTION

Job Description

Tender Notice For Construction of 140 latrines in Merka District-Lower Shabelle Region –SWS of Somalia

Date of EoI:                           1st November 2020

Closing date:                          20th November 2020

Ref No:                                   ARD/Merka/WASH/003

To be addressed to:              ARD Merka Office

To be dropped at:                  ARD Merka Office

Contact:                                 ARD Merka Office

                                               Horseed Road, Merka District         

Contact Person                     Abdimajid Mohamoud

                                               +25262-3-882935

Service Delivery Period:   1st Nov 2020 to 31st March 2021

African Relief and Development (ARD) is implementing a WASH project titled Providing life-saving and sustainable WASH services to undeserved IDP and host communities affected by floods in Merka district lower Shabelle region in partnership with OCHA Somalia. For this purpose, ARD is inviting to bid for the construction of 140 latrines to the capable vendors selected through a competitive tendering process and ARD WASH team will supervise the construction works.

ARD hereby invites applications to establish contract with reputable and financially stable vendors with vast experience capable to construct140 latrines in the targeted locations in Merka district as specified in the bid advert that will be implemented from 1st Nov 2020 to 31st March 2021. The vendors with capacities and can fulfil the required qualifications will be required to submit their expression of interest and the BoQ template filled out:

Bills of Quantity for construction of flood flood/normal Latrines at Merka   district
unitqtyunit costTotal
LATRINE
stated, Rate shall include for
a) back filling with selected excavated material & consolidating. Surface treatment; compaction before filling / foundation.
b) disposal of surplus soil as directed & keeping all excavations free from water unless other wise measured separately.
c) any additional excavation for working space.
d) Trees will require for protection
Excavation & Earthworks
Clearing and preparation of the site, shrubs and bushes including cutting down of small trees not exceeding 600mm wide girth and removal of top soil up to a depth of 150mm & disposing as directed: approximately 100m away10
Bulk excavations
Excavation for pits not exceeding 1.5m deep from the stripped level in any material except rock : include removal of excavated material and depositing where directed: approximately 100m away10
Ditto: over 1.50metres deep but not exceeding 3.0metres deep from the stripped level10
Planking and strutting (in loose soils)
Allow for Planking and strutting to sides of excavated pits: including removal of fallen materials1item
Excavation and Earth works 
CONCRETE WORKS 
Rate shall include for form work depositing, handling, hoisting into position, vibrating, curing etc. and making good after removal of formwork etc.Note
Reinforcements are paid separately unless otherwise specified in the itemNote
In Situ Concrete
Supplying and placing of Grade 20 concrete as specified on 150mm thick pit foor beds1
Ditto: in strip footings3.0
Ditto: external floor beds: 100mm thick12.0
Supplying and placing of Grade 25 concrete as specified in ground beams 250x200mm.3.0
Ditto: suspended slabs: 150mm thick1
Formwork
Formwork as specified to vertical sides of floor beds10.00
Ditto: edges of ground beams10.00
Ditto: soffites of suspended slabs10.00
Ditto: edges of floor beds1
Boxing Formwork to form opening size 450 x 600mm for manholes1No
Ditto: opening in slab size 200 x 300mm1No
Reinforcement: (All provisional)  
Rate to include for supplying, cleaning, cutting, bending, fabricating, placing and the provision of all necessary temporary fixings and supports etc. including binding wires, bends, hooks, tying wires, distance blocks, steel separators/spacers (designed   if any included in quantities)Note
Note :
a]   For the description of materials and   workmanship refer “Specification of works”, “preambles” and “Drawings”.Note
b] Rate shall include forNote
Roof structures
Steel angle bar section 40x40x5mm as roof rafters 2300mm in length spanning 1500mm wide properly anchored in concrete beam to walls.10No
Allow sum for any other item required for the construction and completion of the roof framework, which are not covered under the above items ( The items will have to be approved and paid accordingly)2Item
Structural Metal works    
FINISHES
The contractor is advised to refer to the specification prior to pricing of this section of workNote1
All samples shall be provided for approval by the Engineer prior to purchase of materials.Note
     
Labelling
Rate shall include for preparation of surface cleaning down, smoothing, knotting, stepping etc. protection of floors and fitting, upon completion.Note1
Labelling shall be from approved color with proper names of ARD     and SHFNote
Concrete works 
Finishes 
Labelling 
Provisional Sums 
TOTAL FOR one LATRINETo Summary 
TOTAL FOR   130 LATRINES  
Additional features and construction works for latrines designed elderly and disabled people
Ceramic WC suitable for disablesNo.1
Drails for both sides of the stairs for flood-proof
latrines
No.1
Drails fixed next to the ceramic WCNo.1
SUB-TOTAL
Cost for one friendly disbaled latrines    
Total cost for 10 latrines for elderly and people with Disablities    
 GRAND TOTAL

Submission Procedures:

Bid documents are available for collection from the date of this ITB. Offers must be received before the deadline which is on 20th November 2020 at 05:00 PM hours.

Completed tender documents clearly marked with the EOI Number bided for must be deposited at the ARD Merka Office before the deadline date and time, and recorded in the log book/ letter.

Formal bids being submitted must be on formal company letters, duly signed and stamped must indicate the Full Company Name, Physical Address, Contact Telephone Number/contact Email address, Directors Names, addresses and their telephone numbers.

Pre-requisites for eligibility are as follows:

To be eligible for participation in this tender procedure, tenderers must prove to the satisfaction of the Contracting Authority that they comply with the necessary legal, technical and financial requirements and have the wherewithal to carry out the contract effectively. Technical and financial submissions must be very explicit. Interested Experienced contractor are invited apply this opportunity.

EVALUATION CRITERIA

  1. Mandatory Requirements
  2. Provide a certified copy of a certificate of business registration, certificate of incorporation, business license or similar document. Only vendors within the project areas will be considered.
  3. Provide a certified copy of tax registration, tax clearance certificates or similar documents.
  4. Quotation/Price list of the items
  5. Provide information on ownership structure (Name of directors of the company / Owner/shareholders of the business-Contact address including Telephone Number and Passport)
  6. Past Experience-Provide references of the previous works or goods supplied before (attach Recommendation letter or Previous LPOS/Agreements
  7. Submit the profile of the trader/business
  8. Please indicate Service delivery period
  9. Bank account details
  10. Technical Evaluation

Bids technical evaluation based on the specification submitted

  1. Further Information to bidders:

Currency of offer should be strictly in US Dollars

ARD does not undertake to pay in advance of work.

ARD reserves the right to accept or reject any offer before the award of a contract, or to cancel the bidding process and reject all offers at any time and is not bound to give reasons for its decisions. Canvassing or giving false information will lead to automatic disqualification.

Incomplete offers or offers which do not comply with any of our tender conditions will not be considered. Quotations should remain valid for a period of at least 90 calendar days after closure of the tender.

It is the Agency’s policy to keep all tender values in confidence.

  1. Payment:

Upon contracting for works, the Agency will pay the contractors in instalments as will be defined in the signed contracts.

  1. Financial Evaluation

Based on cost quoted

Quotations should be received at ARD Merka Office or ard.relief@gmail.com

Not later than 20/11/2020 at 5:00 PM.

This EoI does not guarantee a contract of any nature. All proposals will be reviewed and only vendor that meet the required criteria above will receive more details and an invitation to enter into an agreement.